Construction of a permanent structure or placement of permanent materials in a streambed for access across the streambed
If fill material is placed, or would be discharged through grading, excavation, or dredging below the plane of the OHWM of the stream; or if dewatering and construction of a dam is required
If alteration or modification of the bed, bank, or channel of a stream will occur, including excavation and grading work and removal of existing riparian vegetation